Author |
Message |
Jerome J. Lazar, RA, CCS, CSI, SCIP Senior Member Username: lazarcitec
Post Number: 755 Registered: 05-2003
| Posted on Tuesday, September 20, 2011 - 03:51 pm: | |
The structural engineer needs to prepare a section for a project that includes concrete tunnel form work - looking at MF2004 it looks like Section 031113 - Structural Cast-In-Place Concrete Forming is the way to go, any comments? |
Karen L. Zaterman, CCS, LEED-AP, SCIP Senior Member Username: kittiz
Post Number: 83 Registered: 10-2005
| Posted on Friday, September 30, 2011 - 01:02 pm: | |
Assuming there is additional CIP concrete on the site and you already have 03 11 00-Concrete Forming for that, I would make sure that formwork is really what the SE wants -- as he may want 31 72 00 - Tunnel Support Systems. Karen L. Zaterman, CSI, CCS, SCIP-Affil, LEED AP BD+C Moffatt & Nichol - Long Beach, CA |
Mark Gilligan SE, Senior Member Username: mark_gilligan
Post Number: 422 Registered: 10-2007
| Posted on Friday, September 30, 2011 - 11:29 pm: | |
If the concrete is Cast-in-place why does the structural engineer want to specify the type of formwork? |
|